proper operation, The target will be cleaned and adjusted if necessary, end off at H + 4, (Seco Tab D-12 for operating details.) The timor clock will be set to turn the camcra and lights on at H hour 5302 5.3.3 erations Bety H and R 5.3e2el Make finel check on all instruments, 5.322.2 Organize survey toams and continue training, eration er R-H (See Tab D-25 for schedule) 523.301 The first radiological survey will be initiatod aboerd Transits ABLE and BAKER in accordance with Tab D-7, 543.302 At about R +1, one man will heve the task of recovering the film end securing tho camera station on Transit BAKER, (See Tab D-12 for rocovery and securing dctails.) 5.32323 Required radiological surveys for the aircraft Studies Group, 6.4c, will be initiated as outlined in Tabs D-4 and D-7, 5.4 Botween-Shot Preparation (Sce Tab D-25 for schedule) 5e4e1 Check condition of markings at Rediologicel Survey Stations and repaint where necessary. 5.4.2 Check and calibrate all instruments, 5403 Continue treining of monitors (Tab D-10). 5404 Recheck operation of camere station according to Tab D-12, 504.5 Rough deta will be corrected for instrument calibration, docay and other factors, (Sec Tab D-9 for details.) 5.5 Roll-up Schedule (Sce basic plan end Tab D-25 for schedule) 5e5e1 Packing ST. LoU!S FRC Whon all radiological survey operations have been completed, the instrumcnts, parts and equipment will be packed for shipment, The camera station will be disassembled after the last shot end the components packed, ll £6