ey 4.7.3 Ytilities See Tab C-14, 4.7.4 Gr Water n t ent Movement See Tab C14, 4.7.5 Photography See Tab C-14, 4.7.6 Special Services See Tab C-l4, . 4.8 Requirements See Tab C-15 for personnel lists and schedules, 4.9 Shipping and Transportation Requirements Sea and air shipment requirements for matcrials, test samples and personnel to and from test area ere shown in Tab C-16, 4.10 Costs See Tab C-17 for breakdowm of budget and record of expenditures, 5. COMMEND AND COMMUNICATIONS MATTERS (Tust Operations) General operational matters are as given in the basic plan, is shot-time, R-ehour is reboarding time on a particular ship, 5.1 H-hour Pre-Shot Prepsration (See Tab C-18 for details and schedule) 5.11 ST, LOUISF; On-Site Equipment Chock end Calibration SFRC Water lines will be connected to the cleening unit and sufficient operation of the unit will be conducted to determine its performance, Booster pumps will be added as neccessary to give the required water pressure, Other items of ecuipment including water hoses and pumps will be tested for proper performance, The aircraft engines will be run up periodically, The radio equipment will be checked for proper operation after the aircraft has been loaded on the ship. 10 69