cables will be provided, if necessary,
tamination will not be repented,
5.3

Typicol
53 ed

Shot

Simualetion of step-wise docon=

Schedule

Operations Prior to H-Hour

Nons,

5.3.2

Overstions Betueon H ond R Hours (Sco Tab Bel3 for
Schedule)

5302.1
training and bricfing.

Organize

decontamination crews,

Complotc

5.3.2.2

Verify arranguments for instruments and

5.32.3

Check arrangements for transport of personnel

survices vith 6.4d, 6.4f and 6.dg.
from

personnel decontamination center to test ship and return,
5.3.3

Oporations Aftcr R-Hour

(See Tab B-13 for schedule)

5.3.3.1 <Assomble monitors and decontzminrtion teaus
end trensport to tost ship aBLE in eccordsnco ~ith schedule,

5630322 Board ABLE and proceed with decontamination

as planned,

5.3.3.3

“hen deconteminetion of ABLE has been

completed, bring BAKER elongside and decontrminate in accordance with
plan.
5.4

Botween-Shot Preparation (Sec Tab B-14 for schedule)

5.4.1 After decontamination operations have been completed, ,
all equipment will be monitored, decontaminated, checked and repoirod
as NCCOSSEIY.
ST, Louie ran
5.4.2

Upon receipt of the monitoring deta after the first

shot, these will be analyzed to determine the edequacy end efficiency

of the decontamination procedures, the individual methods and thcir
manner of application, Any indicated changes and improvoments will be
made wherever possible. Hot spots vill be located and reduced if they

es
S56

Select target paragraph3