whether or not the experimental deta is typical. (See Tab A-16 for

results),
4.

Administretive cnd Logistical Matters

(Test preparation, Support and Rell-up)

4.1

Pre-test work at USNRDL
None,

4.2

Pre-test work on Transit ABLE and BAKER
4.2.1

Ship Gonversion

Sveciel test surfaces, the washdown system, and

general instrumentation will be installed by Mare Islend Naval Ship-

yard,

4.2.2

Sea Trials

The operation of ,and the water coverage provided
by,the washdown system will be checked and altered, if necessary, with
the help of the Ships' Operction Officer and members of the Ship's crew

during sea trials off the cost of the zone of the interior and et the
test site,
4.3

Post-test vork on Transit ABLE and BAKER

(See Tab 4-23 for details)

43.1 Roll-up
4.3.2 If surface surveys indicate a pattern of residual
activity,then a detailed check of water coverage by the vashdown
system on the test areas will be attempted on Trensit ABLE.
4.4

Post-test Work at USNRDL

4e4el

Experimental Work
None,

Ae4e2 Data Reduction

s7, . LOUIS FRC
ST

Reduced data will be supplied by the Instrumentation

Group (Problem 6.4f).

Y/

Select target paragraph3