5.4

Operations from H-Hour to R-Hour
54-1

Transit Phase Control

The P2V5 will keep Able and Baker on or near their H minus
2 station until shot time or a stated departure time after shottime. The

P2V5 will do this by dialing the ships on a course that will generally
orbit the H-2 station. Departure time will either be a predetermined

departure time taken from Annex HM or will be determined from t elemetered

data received by the Project Officer (CAPT Molumphy) and the Military
Evaluations Consultant (Strope) in the P2V5. At this time the washdown

valve will be remotely actuated by the Project Officer, and the washdown

system on Able will commence spraying.' At departure time, the P2V5 will

direct the ships on a course upwind into the contaminating event.

At the

same time the P2V5 directs Able and Baker into the conteminating event,
it will dial the sinusoidal maneuver, and the automatic pilot aboard each
ship will commence directing this series of course changes.
54.2

Shins! Location and Radiation Information
In the P2V5, the Projct Officer and the military

Lvaluations Advisor will maintain a continuous record of the position of
the ships and the radiation intensities on each ship. Ships' locations
will be determined by radar from the plane and radiation intensities will
be gathered by multi~channel telemetering e quipment.
52403

Ship Recovery

ST. LOUIS © ae

The ships will be turned onto a course toward ‘IOLALA
either (1) when they reach a point two miles downwind from the reef of
Bikini Atoll or (2) when the general radiation intensity on Beker reaches

1000 r/nr, whichever occurs first, or (3) at the discretion of the Project

Officer,

It is anticipated that, in the case of (1) or (2), this time

will be approximately H-plus-2. As soon as the shipsare clear of the
contaminating event and are within range of HMOLALA (from 10 to 14 miles),

control will be transferred to MOLALA.

The P2V5 will be in voice

communication with both MOLALA and TAIATONI at this time and will direct

operations immediately subsequent to MOLALA's taking over control.

it is desired to continue the washdown on Able, based on telemetered

If

intensity information received by the P2V5, MOLALA will direct Able on

various maneuvers to ensure that all areas of the ship are wet by the
washdowm, ‘shen Able has been sufficiently washed, MOLAIA will turn off
the spraying’ array by remote control and the washdown pumps will pump
overboarde Paker will also be controlled by MOLAIA, but will not continue
to maneuvere TAWAKONI will approach each ship and the Radiological Safety
Adivsor will conduct a raciological survey of the ship. As a resuit of
these surveys, one of a mumber of courses of action may be followed, ail

directed toward returning the ships to Eniwetok immediately and expeditiously.