—_ om -——- = —_ 3014.2 Photograph the fallout on TRA:SIT Baker from the various shots in which TRAJSIT Baker participates. 3.14.5 Annex D outlines the objectives, procedures, and logistic requirements for the radiological survey and photography group. 3.15 Interior Contamination Problem (6.4e) 3.15.1 Obtain information necessary to determine the radiological hazards in interior compartments at various times after burst as a result of external radiation from airborne and deposited activities in spaces and ductings. 3.15.2 Obtain inform tion necessary to deteraine the radiological hazard in interior compartments as a result of the inhalation of airborne contamination in ships spaces. 5.15.3 Obtain information regarding the nature of the contaminant to which the ships are exposed in order that the observed interior hazard may be susceptible to interpretation. 3.15.4 Obtain information necessary to determine the effect of standard components of boiler and ventilation systems on the hazards listed e>ove so that qualitative extrapolations to other systems can be mede. 3.15.5 Obtain information necessary to determine the overall effectiveness of various protective. devices in reducing the extent of the radiological hazard from ventilation systems. 3.15.6 Annex E outlines the objectives, procedures, and logistic requirements for the interior contamination group. 3.16 Instrumentation Problem (6.4f) 3.16.1 Design, plen, develop, specify, construct (or contract for construction), install, and operate a gamma radiation detecting and recording network on TRANSIT Able and Baker, and provide a systemfor automatic data reduction. 3e15.2 Annex F outlines the objectives, procedures, and logistic requirements for the instrumentation group. 3.17 Personnel Protection Problem (6.4¢) ST. LOUIS FRC 3.17.1 Provide adequate raciological «afety coverage for all Project 6.4 operations, thereby minimizing the persomel hazard associated with the various phases of the test operations. 009521 ee eee I