use of a second support vessel (ATF). Shore headquarters are based inthe RadSafe building on Parry Island, Eniwetok, and consist of a small fulltime administrative staff, a RadSafe organization conducted in conjugetion with TU-7, and an instrument repair facility. 1.5.2 Water transportation is provided by the drone ship's boats. Comunication with all units of Project 6.4 is provided by a short range voice network. During the shot operations, a secondary control station is maintained aboard BAIROKO for maintaining a position plot of the drone ships and providing for their emergency radio control by helicopter. 1.5.3 BuShips Project TRANSIT beinga proof~test of AT’ Counter- measures was assigned to Program 6 "Tests of service equipment and operations” and was designated Project 6.4. Program 6 is one of several Department of Defense Effects Programs being conducted in CASTIE. This group of programs has been assigned to Task Unit 13. This Task Unit is under the operational control of CTG 7.1 for planning and coordination during non-operational phases and under full operational control during the shot operational phase at the test site. Technical direction of the DCD programs is exercised by the AFS\P through CT/G 7.1. All official communic ations with other project agencies and headquarters in c onnection with CASTLE from Project 6.4 are directed to the Headquarters, Task Unit 13. 1.524 The work of other than Project 6.4 personnel is indicated as follows. Pre-test ship conversion and installation of equipment on the test ships will be done by ilare Island Naval Shipyard and San Francisco Naval Shipyard. At the test site, removal and reloading of equipment will be done by personnel from the support ships. Aircraft, test panels, and test plates will be moved to and from the beach decontamination area by personnel of J6, Task Group 7.1. Ship decontamination will be carried out by Task Force personnel under the direction of 6.4 problem leaders. for survey monitoring and sample recovery, ten personnel will be provided from the ships! companies and additional monitors will be drawn from Task Force personnel, to be trained and supervised by 6.4 personnel. The decontamination of protective equipment will be arranged with the Holmes and Narver laundry facility. Assistance at the Personnel Decontemination Center irill be given by Task Group 7. Photographic film to be used in 6.4 will be stored and processed by the Task Force Photographic Unit. Basic information on the physical and chemical nature of contaminant will be supplied by Program 2, Project 2.5. Project 6.5 personnel will aid in ship decontamination and ventilation studies. ST. LOUIS FRC 1.5.5 The chart in Annex K show, diagrammatically, the relation- ship of Project 6.4 with Joint Task Force Seven. complete organizational outline for sroject 6.4. 009521 Annex "K" includes a qn //