LIST OF TABS

Zab Ho.

Paragravh Ref.

El

Tab Contents
Drawings of boiler and ventilation
systems,

E<2

Instrument and duct section locations,

E=3
Bd
E-5

Filter paper studies,
Model construction and testing.
Air sampler design and performance,

E=6

Particle collecton design and
performance.

E@7
E-§
E-9
E-10

Beta decay design and performance,
“Counting chambers,
Pretest vork on Able and Baker,
Recovery operations,

E-11

2.6a analyses,

E-12
E-13
E-14,

Instrument and equipment list.
Survey requirements,
“isc, requirements from task force,

Eel5

Gamma time intensity measurements,

E-17
E-18
Eel9
E-20

Manpover requirenents,
Sample Shipment,
Costs,
Communication and timing links,

“lise, information from other programs,

"ty

E-}6

-12-

JO /

Select target paragraph3