A
--!

d. The k~

aontrad dr-~y

-t-d

into prtided for %rnea to

lay a new 6W main, open new wells, and generally rehabilitatethe braokish
aystam. This he prooeeded to do, hying his new line from the Signal
Center down the highw~ and putting in new wells, one in the warehouse
area, and one in the area behind tho new meus hall. The first of these
wells, the one in the warehouse area, after coming on the line about
1 February, served as the entire braukish water suppljjfor the Army end
of’the island Until the seoond line came on about 20 February. The ATC
operated their pumps only intermittentlyafter the first describedwell
came into uee.
e.

During the period after arrival of constructiongroups and

prior to the opening of the contractor’sfirst well, the ATC waa furnished
both equi~ent and assiatanoe in keeping their aystan going. Twe pumps
whioh had been ordered in anticipation of this trouble were installed, one
in ATC No. 2 well and one at their ele~ated tank.
90 &und~
a. The following ●ctiona were taken ~
.

to laund~.

this office with respeot

The original reoonnaiauancodisoloeed that ATC and Nawy eaoh

operated a laundry. The Navy one was a fixed type installed in buildings$
the ATC one was a trafler mounted setup with various modificationswhioh
put mush of it in buildings. lia~ ●lso had, en route, the maohinery
recently rmoved frm a large laundry elsewhere.
b.

In a conference on 8 November 1947 it was mgreed by all

oonoemed that the Navy laundry would be expanded and rehabil~tatedwith
the view of taking the entire load. ~ia war oonfixmed in a large general
Seotion XVI-A

18

Select target paragraph3