A --! d. The k~ aontrad dr-~y -t-d into prtided for %rnea to lay a new 6W main, open new wells, and generally rehabilitatethe braokish aystam. This he prooeeded to do, hying his new line from the Signal Center down the highw~ and putting in new wells, one in the warehouse area, and one in the area behind tho new meus hall. The first of these wells, the one in the warehouse area, after coming on the line about 1 February, served as the entire braukish water suppljjfor the Army end of’the island Until the seoond line came on about 20 February. The ATC operated their pumps only intermittentlyafter the first describedwell came into uee. e. During the period after arrival of constructiongroups and prior to the opening of the contractor’sfirst well, the ATC waa furnished both equi~ent and assiatanoe in keeping their aystan going. Twe pumps whioh had been ordered in anticipation of this trouble were installed, one in ATC No. 2 well and one at their ele~ated tank. 90 &und~ a. The following ●ctiona were taken ~ . to laund~. this office with respeot The original reoonnaiauancodisoloeed that ATC and Nawy eaoh operated a laundry. The Navy one was a fixed type installed in buildings$ the ATC one was a trafler mounted setup with various modificationswhioh put mush of it in buildings. lia~ ●lso had, en route, the maohinery recently rmoved frm a large laundry elsewhere. b. In a conference on 8 November 1947 it was mgreed by all oonoemed that the Navy laundry would be expanded and rehabil~tatedwith the view of taking the entire load. ~ia war oonfixmed in a large general Seotion XVI-A 18