smm!P!Clearing sites. There was extensive clearing of buildings

b.

done in the Able tent site, looated across the road from ATC l’emainal.
c. Clean up -d removal of unwanted partitions in ATG Headquarters and mess. In the latter we gave thekitchen floor 3 separate lye
baths in en effort to free it from grease.
d.

Selection and preparation of motor pool.

2. Arrival of First Material
me

first materials,

together with equi~smt, arrived on the Long

Splice about 28 December and were available for uae about 1 Januaxy, which
for all praotical purposes was the date eonstruutlonwas initiated. The
Long Splice carried the follcwring
major materials:
About 160 M Ft l!xnber
6000 saoks of oement
A large proportion of our plumbing and electrical supplies
About half of the mess equipnent (which in general was all
supplied by Navy)
The Long Splice oarried the following vehicles and equipnent for u8:

*

8-

1/4 ton truoka

2-

1-1/2 ton truaks

6-

ii-l/2ton dump truoka

8-

4 ton dunp truoks

1-

● ro

welder, trailer mtd

1- compressorair, truok mtd
1-

shop truok

2-

road graders

Section XVI-A

12