Statiattoa. There followe a tabulationof the ●tatiotlom of
tho major items of tedmioal eonstruotion. NO attempt lms been -do
to ●ooount for all the man houre expended An the oonstruotion,nor
have statiatiocbeen furnishod on the several SS1l items of oonet?UOtion, usually consisting of minor oarpentry or the ?ehaM litation of
an existing struoture,when it waa felt that suoh informationwould
be of no value in Plting future operation. The nmterlal is -bulated in two parts$
Tabulation of materials for eaoh major struotum
Conetruotionof major iteme oa eaah island giving starting
dates, completion dates, ●nd man hours.
Tabulation of Materials for Eaoh Major Struoture
All oonoreta listed in this aeotion was mixed with ooral ●ggregate ●nd ealt water exoept as otherulae noted. Conarete indioated
as 270 lbs per ou ft was mixed ●ooording to cpeoifloationafurnished
by Dr. Roy W. Carlaon, AEC Consultant. High early strength o~nt
was used in all ooncrete exoept the OCE test structures,and in the
270 lb per ou ft oonorete. All ouring was with ●alt water.

BLAST BUILDING
hawing Number

E-16
E-19
B-20
E-29
E-47

Number Construoteds

S

*terial for one Struotum t
Conorete
S/4n * reinforcingsteel
1“ ●q reZnforoingsteel
2“ pipe
FoBLAST FOOTIHa

Drawtllgmumbo?

165.4 OU. @s.
10494 lbe
4216 lbs
98
2s36 ●q ft

TYPE ‘An

B-16
E-24
B-26

Ntier Conetrueted$

26

Material for one Struotures
Conorete

8.6 Ou yd8
65

Section XVI

Select target paragraph3