Statiattoa. There followe a tabulationof the ●tatiotlom of tho major items of tedmioal eonstruotion. NO attempt lms been -do to ●ooount for all the man houre expended An the oonstruotion,nor have statiatiocbeen furnishod on the several SS1l items of oonet?UOtion, usually consisting of minor oarpentry or the ?ehaM litation of an existing struoture,when it waa felt that suoh informationwould be of no value in Plting future operation. The nmterlal is -bulated in two parts$ Tabulation of materials for eaoh major struotum Conetruotionof major iteme oa eaah island giving starting dates, completion dates, ●nd man hours. Tabulation of Materials for Eaoh Major Struoture All oonoreta listed in this aeotion was mixed with ooral ●ggregate ●nd ealt water exoept as otherulae noted. Conarete indioated as 270 lbs per ou ft was mixed ●ooording to cpeoifloationafurnished by Dr. Roy W. Carlaon, AEC Consultant. High early strength o~nt was used in all ooncrete exoept the OCE test structures,and in the 270 lb per ou ft oonorete. All ouring was with ●alt water. BLAST BUILDING hawing Number E-16 E-19 B-20 E-29 E-47 Number Construoteds S *terial for one Struotum t Conorete S/4n * reinforcingsteel 1“ ●q reZnforoingsteel 2“ pipe FoBLAST FOOTIHa Drawtllgmumbo? 165.4 OU. @s. 10494 lbe 4216 lbs 98 2s36 ●q ft TYPE ‘An B-16 E-24 B-26 Ntier Conetrueted$ 26 Material for one Struotures Conorete 8.6 Ou yd8 65 Section XVI