in Monday, 29 March. The work was finished on 30 March, and both east
and west ditches were backfilled.
A detail of one Officer and 10 EM of Company E moved to Aniyaanii
Island Tuesday, 23 March, and in one week completed the erection of a
generator shed, seismographshed, servicingand installing’two 15-KW
generators,and the laying of 25,000 sq. ft. of pierced plank to complete
the Light Aircraft Landing Strip which had been cleared and graded
previously.
The week ending 3 April was spent doing final cleanup work, most of
the working crews assisting various AEC glvups. With the exception of
soil stabilizationand minor details, the entire Runit Island project
was completed 3 April.
From 29 Dec b? to 3 April 48, appmndmately 14,250 man hours were
used by Company E in completing its mission. The man hours

shown with

other statistics in the attached chart are only those used in actual
construction of the planned project and do not include those used in
housekeeping, constmction of quarters, or assisting the scientific
groups.
Many samll problems ● rose as the work progressed, but were solved
without causing serious delay in the work schedule. Of great assistance
in this respect was the nwbile heavy maintenance shop established on
this islmd at an earlier date. Shortages, such as form tie bolts and
other machining jobe were fabricated quickly by the zmchine sbp.
equipmmt was very much in demand throughout th