were corrected approximatelyone hour and thirty minute8 later. IVo firther difficultieswere experienced. A modification in radiological ~urvey party c=~ications be equipped~th required that two additional landing craft HF voice equipment (TCS) by the BAIROKO. During the interval between the firstand second tests all equipment on the A~~E were checked ad new crystals were installed. A third circuit using VHF voioe (SCR-300)was provided to be used in the event Of failure of both HF voice channels. A remote speaker amplifier aovering the GeneralWarning circuit was located on the level above the Flag Bridge to provide direct test timing informationto obsemrers and photographers. No communications difficultieswere expe-ienoed during the second and third test periods. To expedite tlw roll-up of communications,the electronicspool material not needed during the third test period was prepared in palletized form and loaded aboard the EAIROKOfor subsequent return to the U.S. Electronicswterial installed in ships, and ships boats was to be repacked during the return trip and be ready for discharge upon arrival in the U.S. All remaining electronicsmaterial which oould not be removed until after canpletion of the third test was then removed and transported to a central warehouse for packing and shipment by scheduled cargo runs established after departure of the main body. 109 Section XI