were corrected approximatelyone hour and thirty minute8 later. IVo
firther difficultieswere experienced. A modification in radiological
~urvey party c=~ications
be equipped~th

required that two additional landing craft

HF voice equipment (TCS) by the BAIROKO.

During the interval between the firstand second tests all equipment on the A~~E were checked ad new crystals were installed. A
third circuit using VHF voioe (SCR-300)was provided to be used in the
event Of failure of both HF voice channels.
A remote speaker amplifier aovering the GeneralWarning circuit
was located on the level above the Flag Bridge to provide direct test
timing informationto obsemrers and photographers. No communications
difficultieswere expe-ienoed during the second and third test periods.
To expedite tlw roll-up of communications,the electronicspool
material not needed during the third test period was prepared in
palletized form and loaded aboard the EAIROKOfor subsequent return
to the U.S. Electronicswterial installed in ships, and ships boats
was to be repacked during the return trip and be ready for discharge
upon arrival in the U.S. All remaining electronicsmaterial which
oould not be removed until after canpletion of the third test was then
removed and transported to a central warehouse for packing and shipment
by scheduled cargo runs established after departure of the main body.