4.

TIISI
handlhig of ory@o material, including transfers,

destruction,reports, compromises repairs, and any correspondence
Pertainingto crypto material was to be in accordancewith tie
Registered PublicationManual.
5. A chart showing the distributionof cryptographicmaterial
for Operations “Sandstonen is contoined in Annex Fox (Communioations
and Electronics Plan) of Field Order !hnmberone, Joint Wsk Foroe
Seven as page F-IV-Tab 1.
CALL SI(2US
, ROUTING INDICATORSAND DELIVERY GROUPS
All oall signs, routi.ngindicators and delivery groups for Naval
units were obtained from currently offective “JAKAP” publications.
Cell signs for special elenmsts created for this project and operating under Havs1 oontrol were covered by assignments from the spare
blocks in the appropriateJAMAP publicationsand so authorizedby
CI?Oand CIliCPACFLT.
TESTS AND OPERATIONS
It had been planned that the additional and speoial ccmmnioations equipmmt instailed on the MT. MCKINLEY, ATSEMARLE, “CURTISSand
BAIROKO would be 06mpletelyinetalled and ready for limited operational tests by 15 February 1948. Due to installationand logistios
problems, it waa not until 23 February that the equipment was ready
for testing. During the testing period, it was neoessary to observe
radio silence during certain hours and in some instances, to employ
dunsnyantennae so as not to interferewith domestia communication
98