oa _- “Ss semaines tos Bases . em ee tes VOCED we et ek 8S Side ee Cle lee MTSE -—— FT aot. ove RT rojecting the Cransducers suc cn dscns ehich, when closet, aicsectisn circumference. ee ew ww ee Se eed Ses Sloop ei cce = :ormd arcs of tre Deo such Jcors were used directly: cppesite eaca otser on a circusferesce ami each projected one set of transducers. Toes the Statica TX*205 rocket uses a estal of six calorimeters and reguirecd caly one Freatoue circuit and one Ceiezecering subchannel. A second sudchunadl sas used ior bacaup, since it was availabie. The instmment ports of the Station TK-252 rocket were kept cwered ani the projecting doors of the Station 209 racket were kepe closed 5: tight spring- steel beles. The belcs were released at predeterained aleitudes by seans of sguib-fired retaining boles. 2.2.3 Operational Probleas Teo problems conceraizg these instmments were revealed in Tooopah test firings involving one of each cype of carrier vehicle. In che case of the. €52,000-foot rocket, it was outed that che temperature of the theraal ratistioa calorimeters rose approximacely 40 degrees Centigrade above ambient upon iznition of che second stage. An examination of the geometry involved showed thac upon assembly of che vehicle a portion of the second-stage igniter protrided into the instruvented sidsection and was free to radiate heat into the base of these calorineters. The instrumented Teak flights showed that corrective measures taken to elininate radiation beating helped only slighely. be assumed thac this trouble arose from another cause. Ie suse Evidence of bot iszniter gases leaking into che aidsection compartment of a rad-chea sazpler recovered from the Teak shot has caused some speculacion thac this could have caused the trouble in the instmmented aidscctions. In the Tonopah teste of the 209,000-fouor rocket, it was found that, in asse=bling the vehicle for firing, che instrument doors were used as access ports to facilicace the sasing of mechanical couplings. It has been established that one or more lead wires were severed because of this situation, Sut tne dirficulty was eliminated dy placing the lead wire connectors inside a protective alisisua box.

Select target paragraph3