£ an_y DENTE (212) Project 6.5 - Analysis of Electromagnetic Pulse Produced by Nuclear Explosions ~ C. J. Ong OBJECTIVE The objective of Project 6.5 is to obtain waveforms of the electromagnetic radiation for all the detonations during Operation REDWING. This data is to be used in connection with a continuing study relating the waveform parameters to the height and yield of \ the detonation, _NSTRUMENTATION Two identical stations are used to record data, one at Eniwetok q and one at Kwajalein, The instrumentation consists of a wide-band receiver with separate outputs connected to each of the three oscilloscopes. Mounted on each oscilloscope is a Polaroid Land Camera for recording the transient display. RESULTS Station A: Eniwetok Data was recorded on all oscilloscopes. The predicted field A strength was and the measured field strength was The waveforms are good and shoals provided data sy 5 when analyzed. Station B: Kwajalein Data was recorded on SS oscilloscopes. The predicted field 7h uy strength as TS and the measured field strength vasa en Opy The recorded wave forms were of good quality and should provide data, Lang LoOf u ~ 32 :

Select target paragraph3