PAGE FIVE TWX NR S-12e5
THE CONFERENCE WAS WELL ATTENDED AND PROCEEDED ON A WORKMAN-LIKE
BASIS PD WORKING COMMITTEES WERE ESTABLISHED ON THE SECOND DAY TO
HANDLE CLN
Ae FUTURE REQUIREMENTS SMCLN Be PERSONAL PROPERTY SMCLN Ce. REAL
PROPERTY SMCLN Be. CONTRACT REQUIREMENTS PD
TO THE BEST OF MY KNOWLEDGE CMM SATISFACTORY PRELIMINARY ARRANGEMENTS
en
—_—
WERE MADE IN ALL CASES
AINEGOTIATIONSWITHHOLMES
ANDNARVERVEREUNDERVAY ON MAY 25 CMM AND I AM TOLD THAT NEGOTIATIONS
WERE SATISFACTORY TO BOTH PARTIES PD READINESS WAS INDICATED ON
THE PART OF THE INSTRUMENTATION CONTRACTOR CMM WHICH WILL BE EDGERTON
CMM GERMESHAUSEN AND GRIER CMM INC CMM BY SEPARATE CONTRACT PD
INDICATIONS ARE THAT THE TAKE-OVER CAN ACTUALLY BE ACCOMPLISHED
ee mre te
EFFECTIVE JULY 1 CMM 1960 PD AS PMR WILL HAVE DIRECT CONTRACTS
ee
A art ie tees SEee
WITH HOLMES AND NARVER AND EG AND G CMM THERE WILL BE NO AEC
REPRESENTATION IN THE FORWARD AREAS AT OPERATION TIME PD THERE WILL
a aE
RE
Nea mloh ce the a epee NM a RE NL
aneeAMOaes
PROBABLY BE SOME MINOR EXPENDITURES IN FY 61 CMM DEPENDING IN PART
ON ACCOMPLISHMENTS MADE DURING JUNE PD
DMA WILL BE KEPT ADVISED OF PROGRESS OR PROBLEMS BY TELETYPE
——
END REF ALT/JER-2182
BT
01/0055Z
RECD VIA TWK O1/0120Z JS
ak A a ems eo 8 te mee
a saintIhde: