ut,
a one to cne correlation of the data taken on both systems.
-——t
tho normal back-scatter channels were operated.
Five of
Only three cameras
were operated on thie event, the cne back-scatter camcra and the two
vertical cam-ras.
Troject 5.7 instrwrentation on the B-57 consisted of the basic
twenty one instruments and six camsres.
Project £.7 instrumentetion on the B-€6 esonsisted of the basic
twenty one instrumonts and twelve cameras,
Neither tactical bomber (B-466, B-57) was instrumented for measuring
bach-scattere? thermal radiation.
The twenty one basic thermal instru-
ments possessed various ficlds of view and were suitably filtered to
obtain qualitative spectral distribution information.
=
All channels were
recorded on Consolidated Recorders excerpt thre five back-scaiter channels
in the P-47 which were recorded on magmetic tape.
The cameras were
equipped with red anid blue filters te obtain information at each end of
trum,
Several cameras were
equipped with
te attuchments to chtafin centinucus scpectra in the visible
regicn,
Two of these speetrecraphs were operated at the "G&G Ferry photo
In?crmaticn on the pesition in space of each aircraft is ccntained
COPIED/DOE
LANL RC
- 23 =