TIAL c. RONGELAP - Project 6.6 will require 125 barrels of diesel fuel and 10 barrels of gasoline. to TG 7.5 (H&N).d. Thie requirement has been submitted by TG 7.1 KWAJALEIN - If power is not available (See para 10d(2) above, 90 barrela of diesel fuel and 2 barrels of gasoline will be required by Project 6.6 to operate a 20 kw diesel generator (to be furnished by TU-3) and, in addition, an emergency generator. In this event, CJTF SEVEN assistance may be required. e, le. WAKE - See 10 f above. SHIPPING of SUPPLIES and EQUIPMENT: a. All supplies and equipment for all projects are being shipped by the projects to arrive at NSC Oakland, California, by 20 December 1957. b. For information, the following surface schedule for shipping to and between off-atoll sites has been established and furnished to the projects. REVISED TENTATIVE SHIP SCHEDULE WEATHER and RAD-SAFE STATIONS i. LST 664 Ly Ar Ly Ar Lv Ar Ly Ar ENIWETOK RONGELAP RONGELAP UTIRIK UTIRIK WOTHO WOTHO ENIWETOK 2000 0700 1800 0700 1800 0700 1800 0700 9 11 12 14 15 17 18 20 March March March March March March March March 1958 1958 1958 1958 1958 1958 1958 1958 LSM 44h Ly Ar Ly Ar ENIWETOK UJELANG UJELANG ENIWETOK 1900 0700 1800 0700 19 20 21 22 March March March March 1958 1958 1958 1958 USS MONTICELLO (LSD-35) Lv Ar Lv Ar Ly Ar ENIWETOK KUSAIE KUSAIE KAPINGAMARANGI KAPINGAMARANGI ENIWETOK 0800 700 1800 0700 1800 1800 24 15 16 18 19 21 March March March March March March 1958 1958 1958 1958 1958 1958 USS COMSTOCK (LSD-19) Ly Ar Lv Ar Lv Ar ENIWETOK NAURU NAURU TARAWA TARAWA ENIWETOK 0700 0700 1800 0700 1800 0700 20 22 23 25 26 29 March March March March March March 1958 1958 1958 1958 1958 1958 Z,? £O, & oy, Up lO, PER DOC REVIEWJAK. 2978 LES ——

Select target paragraph3