OPERATIONS PLAN

4.

B.

~3

Frozen cargo transfer and storage MAC flight to Hono
February 15.

Enewetak Base Support

i.

Billets
LLL

4 people nights of January 31 and February 14

U of H

January
R.

Buddemeier

17

*D,. Buddemeier
*S. Petty
S.
W.

Wheatcraft
Souza

B.

Tilbrook

7

17 and 31
17 and 31
17 and 31
17 and 31

S. Goff

17

14

24

14

W. McConachie

7 and 14

E. Stroup

3 thru 24

J. Coleman
M,. Atkinson
M. DeCostra

3 thru 24
3
thru
10 thru 31

S.

February

Smith

7

17 thru

7

*R, Redalje

24 thru

7

*S.

24 thru

7

Weil

*denotes female

Messrs. Stroup, Coleman, Atkinson and DeCostra will stay in
Enjebi trailer January 11 through January 17th and some
may stay at Enjebi the following week.
Enjebi Base
a.

Food, full water truck,
if available.

fuel,

linens, large tent and cots

b.

Generator, operational.

c.

1 mule and 4 x 4, operatioual.

d.

15 5-gal. drums gasoline for vehicles and 3 55-gal. drums 80
octane gas for air samplers (can substitute mogas if
necessary), 1 case motor oil, 5 gal. hydraulic fluid.

e.

1 operational whaler (to be shipped from Kwajalein) .

f.

3 radios

(1 base and 2 handie talkies).

Select target paragraph3