the act with the natives to assure that their case is heard-there are 416 people who have eligibility--they would like to
return 50 people to Japtan Island by December 1972 (this

number would be working individuals).

(2) Diet consists of

fish and rice--thus discussions on the food chain are

essential.

(3) Mr. Carpenter asked is the return to the

TIPI by the end of 1973 feasible--answer yes.
(4) Could we
retain some islands in their entirety--Interior's counsel-return to Trust Territory but not return natives.
(5)
Discussed the differences in ownership--Eniwetok and Bikini.
(6) Eniwetokese want to provide help in cleanup. (7) Divided
responsibilities among agencies: DOD -- fund and be the lead

agency re cleanup, AEC -- survey andassessment and Interior -rehabilitation cost.(8) Environmental impact statement--one

will be needed--DOD's responsibility. (9) Ocean dumping: point
was made that there was a convention in process andbills are in
both Houses of Congress. (10) Reparations status. (11) Appoint
a working group as mentioned earlier.
Recent Deve lopments

1.

Charter to NV has been transmitted--copies to all members.

2.

Technical meeting at LLL on September 19-20, 1972.

Radiological survey will be started early October--period of about six
weeks. Problem--NV is trying to establish a logistic requirement--what
they have to get out to the island and when, logistically. Latest word-SAMPEC called Roger Ray September 13--it will be three or four weeks
before they can get a plane. Special mission-type aircraft required.
LLL wants to bring a fully-equipped trailer to the island to save
reassembly.
There was a description of the overall program--the basic interagency
coordination will be by the normal staff people--operations from the
AEC, radiological NV, and engineering survey DNA. DNA (as DOD agents)
will support us. AEC delegated NV working on an operating basis with
DNA. An explanation of the chain of command was given. PALOMBO will
support the field survey effort--September-December 1972. It has lab
equipment on board.
DOS has a draft plan which will be finalized next week.