1.
Pre-shot check out of filter unit operation will be performed by Iz
TU 3.4.2.
2.
Bre-shot preparation of filter panels and installation of the filter
papers in the panels will be done by 1.7 personnel in Bldg. 57
on Eniwetok.
3.
.
Pre-shot installation of filter panels in the units @n the drones
will be done by 1.7 personnel with use of two weapons carriers to
transport materials.
4.
re-shot
The latest,meteorological data will be examined # by 1.7 personnel
for effecton predicted cloud x rise times and changes (if any)
the prrasing of
in,initial entry time sphatrrg
5.
for the drones wil be given to Tu 3.4.2.
Post shot recovery of filter panels from drones will be done by four
1.7 personnel brought from the Z.I. for this purpose and aided and
supervised by 1.7 personnel already at the atoll.
Two weapons
carriers and the 1.7 Eniwetok jeep will be required for this operation.
The panels will be loaded into lead boxes provided by 1.7 and the
boxes transferred to two special sample aircraft.
will require a fork lift.
This operation
All recovery operationswill be checked by
four Rad-Sefe /Momelsre ceriglar Ce denekii, of Prag .
Corayne bhnrce.. 707-0, Boca tert WF Plank ark be dented hy hn, W927, WKlew mh Eb
D. Wu. Sopeneee.
ole?
ANS
Oey