1. Pre-shot check out of filter unit operation will be performed by Iz TU 3.4.2. 2. Bre-shot preparation of filter panels and installation of the filter papers in the panels will be done by 1.7 personnel in Bldg. 57 on Eniwetok. 3. . Pre-shot installation of filter panels in the units @n the drones will be done by 1.7 personnel with use of two weapons carriers to transport materials. 4. re-shot The latest,meteorological data will be examined # by 1.7 personnel for effecton predicted cloud x rise times and changes (if any) the prrasing of in,initial entry time sphatrrg 5. for the drones wil be given to Tu 3.4.2. Post shot recovery of filter panels from drones will be done by four 1.7 personnel brought from the Z.I. for this purpose and aided and supervised by 1.7 personnel already at the atoll. Two weapons carriers and the 1.7 Eniwetok jeep will be required for this operation. The panels will be loaded into lead boxes provided by 1.7 and the boxes transferred to two special sample aircraft. will require a fork lift. This operation All recovery operationswill be checked by four Rad-Sefe /Momelsre ceriglar Ce denekii, of Prag . Corayne bhnrce.. 707-0, Boca tert WF Plank ark be dented hy hn, W927, WKlew mh Eb D. Wu. Sopeneee. ole? ANS Oey

Select target paragraph3