~
.
+
ee
.
.
es
et
ee OG
.
”
a
Sect.
ke
ne
=
F
a
_
a*®
~ hah, ee
\ pee Mgr sy
sink ticCama nail Misttet catES ne aicgtod Rela on, aS Bais dam
APPENDIX
INDUSTRIAL PRODUCTION
ia
aad
4
ef
a
No industrial enterprise, in the usual sense, is carried on in
Following is a list of Trust Territory power plants,
Micronesia.
their
connected
and firm capacities
and recent peak demands:
Total capacity of power equipment installed in each Trust Territory district as of
June 30, 1968
Number of units
Capacities and peak demands
5-700 KW Worthington
1-600 KW Worthington
1-660 KW G.M.C. 567 Portable
3, 500K W
600
600
Total connected load
4,700KW
4,COOKW
2,700KW
District
MARIANA ISLANDS
SqipON .- ee es
Firm power (3300-700)
Recent peak demand
Rota. .....c. es eee eee
225K W
150K W
130KW
3-75 KW Caterpillar
Firm power
Totai demand (estimated)
There are no meters or information, but two engines are
required on peaks.
300K W
200K W
100K W
3-100 KW Waukeshaw
Firm capacity
Peak load — under
One unit carries the load at all
times. —
PALAU.................
stat badeBe
Che
nthe PB cg
Tinian oo. ll... eee
1-375
1-310
1-500
3-500
KW
KW
KW
KW
375KW
STOKW
SOOKW
1, 500KW
Fairbanks Morse
Fairbanks Morse
Caterpillar
Enterprise
2,685KW
S51OKW
535KW
Total capacity
Firm capacity
Recent peak demand
Note:
Both Fairbanks Morse generators are pre-war units.
They are in poor operating condition. Page Power pliant
and facilities have been turned over to the Territory.
They consist of 3-500 KW units.
YAP 0.0.60 eee
1-250 KW Fairbanks Morse
3-350 KW Caterpillar Unit
250K W
1,O50KW
1, 300KW
700KW
Total
Firm
Recent peak demand
230
320KW
Industrial Production
mee
were
og
Sm ae ee ee we