when used by elements of TG 7.2 which lacked 2d echelon maintenance
capability, These functions were discharged in routine fashion.
The only serious difficulties encountered were the extremely long
time required to obtain repair prts

fron CONW3, and the high rate

of equipment deterioration due to unfavorable climtic condition.
The parts supply prolilemwas complicated by the fact that limited
storage space in the &lpply Depot precluded stcckage of seldomused ~rts

for all.of the wide variety of end items used in the

Joint Task Force.

Statistical data on shop worlikad are in.

closed.27
b. No satisfactory remedy for deterioration due to climatic conditions was fount.,although careful.at~ention to lowerechdon maintenance did lengthen the service life of equipment in
some cases. by

items which had been in use during CASTLE and

had been kept on hand in cdehunidified storage)twere found to be
in generally poor condition. It was impossible to determine whether this condition had existed prior to or as a result of their
having been in storage; however, it was apparent tkt

items which

have been In service under uncontrolled environmental conditions
during an operation anc?are not required for interim period use
should not be retained in storage for the

next operation, Very

few items which had been held over in this

manner were usable for

REDWING.
c.

signal SUpply Was the responsibility>of the general

depot; however, since there was no Signal Corps officer on the
staff of the Depot Sup@y
27-

Officer, the Signal Officer provided

TAB X
89