er
Reproduced from the holdings of the National Archives
Pacific Southwest Regio:
SURVEYREQJTien~
TN
jv
June 4, 1953
,
Site Elmer
Triangulation:
The final observation was made the ule: t of June lst.
Direction and Abstracts reaclied Par-y . ine 3rd.
The Records of
At Tare the only check-
ing done was for closure i: individual Criangles end Quadrilaterals.
work is being checxed and printed «&'
‘: i- writing.
The
Due to the time factor,
the Records will be mailed as scon as urinted and computations will follow,
A cursory exarination reveal: tat
stances,
Wher. I arrived st Tar
imit: nave been exceeded in some in-
fTicsday, June 2nd there was a discussion
on the question of re-observing at Station Sugar.
Due to the weather out-
look, I had no hesitation in calling off the Operation.
have prevented an examinatior of th. xerords,
Other matters
However I feel that unless
some considerable discrepancy develeojs,
‘1e work should be regarded as
concluded.
bLnet further work is required, a
If the Home Office ‘clievea:
memorandum to that e“tect vil
fF &. "etir ed,
the Towers in place
« all Gite
Operation.
ustramert.
Redios
surcapiueit
am
«.
Present plans are to leave
che construction phase of the
- recessarvy gear will also remain
at Bikini.
Secondary:
Alfa, Bravo, Zebra, Vic6 10”
In respohse %«
«6
Stations at Etter
G4
omer,
June 7th,
Troane
followed,
A. f somue
mainder,
weeos
ntcon
A concur
(2.
,
Te
ee
Schem
¥ 2
Poser
eervations on the Secondary
4
5.
boo. crap
rey!
re
ot sor were schedulec to commence
TC mygel® is the Plan being
‘rv cite bravo, 2C! for the re=
‘con icft Tare on dume 3rd