AeA? Report No. 59-12 December 8, 1958 Tor A. A. Vergari, Director, Finance Division San Francisco Operations Office From: J. He Mac Neill, Chief, Audit say?tae decee. INTERIM AUDIT REPORT UCLRL SUBCONTRACT NO. 108 WITH COOPER DEVELOPMENT CORPORATION Subject ¢ Symbol: | BEST COPY AVAILABLE F RWW 2 1205-06 Costs incurred under Subcontract Noe 108 are audited on an assist basis by the U. S. Navy Area Audit Office, Los Angeles, California. Costs incurred from inception through February 28, 1958 which have bean approved by the Navy are summarized below: Direct Costs Inception 3/1/57 - $2,895.67 $198,007.42 through 2/28/57 Labor Material Oh oh Other 2/ 28/ 58 145 5584.06 263.1 Manufactur Overhead Total $200,903.09 sb 218 5h 23. 186. $3,793.30 $658, 514672 RES HORSE (1) 2,008. saote 157,831.71 Mee 159, 840.1 822,148.15 General and Administrative Over (1) — head 1 ‘6 Bie Wisse Westie e 0 8 e (1) Overhead computation is based on following audited rates: Manufacturing General and Administrative PY ended 2/28/57 9.3 16.26% FY _ended”2/28/58 7967 12.13% Based upon the interim Navy audit, we find that costs incurred from inception through February 2%, 1958 amounting to $922,114.44 are reasonable and properly chargeable to Subcontract No. 108 in accordance with ite terms.

Select target paragraph3