~

\

i OPLAN
2. MISSION:

Conduct a full Case 3 Environmental Impact Statement
enn

approved Cleanup to accomplish those cleanup actions listed in Reference |

a.

Physical hazards will be removed from all islands.

b.

Obstructions to development of habitation and agriculture will

be removed.

Unsalvageable radioactive material will be disposed of in|
'

c.

accordance with appropriate procedures.
d.

Se

ne

Cc, para 5.5.3.2:

In general,_the ERDA guidelines provide for removal of concen-

trations ofPlutonium3in soil exceeding 400 pico curies per gram (pCi/g)9 |
a

for selective removal in the range of 40 to 400 pCi/g and for no manda~

ee = eee et rege te ee

tory action below 40 pci/g.

Woy

.

|

gesTAVAILABLE COPY
guidelines, however, are not sufficiently specific to facilitate detailed

operat ional planning - ERDA has agreed to provide more specific guidances
on the application of the basic Task Group recomendations and to. Pro- %
3
fa

vide greater specificity and operating criteria (see Tab E).
b.

The "Case 3 Cleamp” as described in Reference a conforms with 3 '
S——S

the Task Group Recommendations.

Thus, Cleamup is dependent upon radio~

contaminated, and the classification of soil according to it

oncen =

tration as either (1) greater than 400 pCi/g (mandatory cleanup), (2)

&

less than 40 pCi/g (no cleanup required), or (3) in the range of40_ 4

pci/g to 400 pci/g (individual case cleanup).

P

Select target paragraph3