es from the army and Air Force was no longer necessary, Three technicians remained on duty in the electrical and refrigeration shops of the AEC contractor, During this period a total of 765 man hours, 90 equipment hours, and 762 vehicle hours were furnished the AEC contractor in assistance to his program, During the reporting period, the Engineer Section super- vised, assisted or accomplished the following: a, The processing cf 13 work orders which were sent to AEC for their accomplishment. b. aA clean up of the POL Farm project. c. The wiring of metal prefabricated buildings. d. The coordination of 18 uncompleted army projects and 31 old and new job requests by Air Force, There were 38 major and minor construction projects completed. These included: repair to the sea wall, fishing pier, and tents damaged from typhoon DORIS; fill and compaction of land reclaima~ tion at the trash disposal area; repairs to French doors at the Officer's Club; painting of buildings, including 7 metal prefabricated buildings erected by the Army; construction of generator sheds; construction of a salvage yard; the adaptation of file cabinets for safety locks; the repair of frame buildings; the construction of cement ramps; the construction of partitions and security fences. A total of 6097 man hours was expended on these prcejects, BNA & 180 fcet section of reinforced concrete wall, with footings, was constructed at Duffy's Tavern patio. High tides and rough water seriously hindered placing forms in front of the old wall 28 Aq

Select target paragraph3