Boe)
OFICAL USE
‘be. During the operational period the Commander, JTF SEVEN, assumes
responsibility for the radiological safety of EPG.
However, the
Commander, TG 7.5 (Assistant Manager, Office ef Test Operations )
will retain radiological safety responsibility for TG 35 person-
~ nel and will issué tite necessary implementing instructions to
comply with JIF SEVEN directives.
During the test period, TG 7.1 is responsible for providing the
services normally provided by H&N rad-safety organization during
non-test periods, together with the increased gervice eccasioned
by the operation.
L
ad.
For non-test periods the @TG 7.5’s RadGafety Advisor will be
| Yesponsible for gtaff direction on ail rad-safety policies for
During non-test periods the Director, Pacific Operations Division
is responsible for the rad-safety support services for EPG with
the AEC Rad-Safety Officer coordinating these services.
f.
During non-test periods, the AEC Radiological Safety Officer is
responsible to the Director for the operation of the Radiological
Safety Program as outlined herein.
ge
During a test period, the AEC Rad-Safety Officer is responsible
to the Deputy CIG 7.5 for:
-3GFFICIAL USE ONLY