(i KE WI

f

tne, 2

“ REPOSITORY
.

FOLDER chy,
Vien

MATREC
409022

BET 16 +ae9
te
HRA SS te

peas

ne Me arvnertreteisDUCAST
Nab tys gs
Sees

Drte tly Te Sagres

ma. 7, Ky Chemin

My, Be By Zuokert

0,

eee

ap

eee

ees

,

POA ARO TEATUTE
Aya
.
-

og

Eon.

a

.

rte

CO

AUTHCTY: AUD Ad

ST

RAMS

LED BAXFOR ONDAMRROTRGN E
FIL
UN
LT
UR
OF
cr
Cx
at IVY
Vt ete te

Sabjeots

The General Manager of olan& Yarvar Company, Ince, _

reporte the following ostinates on tha cost of tiie bom:

Initial Estimate, Bax
tnitial R: etimnta, Netal Reef

S693,125
gS
9773,575 |

rar

{is

Th
ar

23.56

are Les

ER (SPeCiz¥)3

5

*

Total Initdel “stinste

tia megs an to actual fined

cost of box
|
Cost of helius, | fiilings

$650,000
& 35,000

Cast of sipping heltua and
returning empty cylinders

“me
$350,000

Probable final. cost

£835,000

To this must be sdded cost of balloons ond lead eollinatara, not sow
Kaowt, to get final total cost,

ae Ib fe dateresting to note here that the originalproposition fran the
laboratory was to perfor this saw function hy wéing coaxial ookile
busied at the voquired depth in the cansewny. the total aont of doing

this experinent this seoond wy was eotinated as follow)

oe aeetthy

ad

yon

ve

cerealeleleoustlAemsae'end:iz

Copy for General Mgr.

fte

ee
#25000,000

SsFICATION, CANCE

7/-0/

gOOO* Comxial Cable @ 220,00

BEST COPY AVAILABLE

$2,000,000

4 De
yP
|

Cansnuiye bulit up to WO, 20', & LOt
Males) gonerate oo
$3 and mane
sles

Select target paragraph3