UNITED STATES
ATOMIC ENERGY COMMISSION
NEVADA OPERATIONS OFFICE
P.O. BOX 14100

LAS VEGAS, NEVADA 89114

40355 16

ae /PA So

NOV 3

Maj Gen. E. B. Giller, AGMMA, HQ
M. B. Biles, Dir., DOS, HQ
J. R. Totter, Dir., DBM, HQ

1970

COLLECTION

V

/

REPOSITORY

Mv#2 tt

D CE,
“

FOLDER

REQUEST FOR POLICY DIRECTION - BIKINI PROGRAM ACTIVITIES
This requests direction on NVOO responsibility for long-term radiological monitoring at Bikini and a definition of program funding
responsibility.
a.

Background
From the time that nuclear weapons tests were last conducted at
Bikini Atoll (1958), the radiological monitoring efforts in
this area have been carried out largely through DBM auspices,
with objectives which were oriented primarily toward biologic
research.
The major exception was the Bikini Clean-up Program of Soring/
Summer 1969, in which NVOO assisted DOD in the conduct ofa

radiological survey and clean-up program, with responsibility

for determining (a) that DOD radiological health and safety

plans for the clean-up were approved by the AEC prior to field
operations; and (b) that radiological health and safety plans
for the scrap removal project were met at completion of the
project. This responsibility included radiological advice and
assistance during the operation, but did not include certification of the islands as to their habitability by humans.

In both the 1969 clean-up operation and the 1970 follow-on

survey, AEC contractors were used both in program definition
and field sampling activities. This included the U. S. Public
Health Service (sampling of plant foods and water, sampling
and monitoring of terrestrial and airborne radiation levels)
and University of Washington (radiological sampling of animal
food, soil and water). ‘These contractor forces were provided
from the capabilities being maintained to support an AEC
readiness-to-test response in the Pacific, and were funded
from the Readiness Program.