for sample 2476.
The results of the other quality control samp:
jo
in this and earlier reports attest to the overall reliability or
the plutonium analyses.
Therefore,
it is likely that @ sample s
of the plutonium fraction of sample 2476 took place during analy:
a
although no positive evidence of such a switch was found.
A thixz
duplicate of this sample will be submitted for Pu analyses to ver
this conclusion.
REFERENCES
{1}
Krey,
Project Airstream
USAEC Report HASL-183,
P.,
Ww.
October
(1967)
(2)
Ibid, USAEC Report HASL-184,
January (1968)
(3)
Ibid, USAEC
April
(4)
<Ibid, USAEC Report
(5)
Ibid, USAEC
(6)
Ibid, USAEC Report HASL-207, April
(7)
Thid, USAEC Report HASL=210, Culy (1969)
(8)
Tbid, USAEC Report HASL-217,
(9)
Krajewski, B.
Calculations of Stratospheric Air Sample Volumes
Report HASL-193,
(1968)
HASL-197, TJaly (1968)
Report HASL-204,
January
(1969)
(1969)
January
(1970)
USAEC Report HASL-211, July (1969)
II ~ 16
wy,