Reproduced from the holdingsof the NatiomalArchives.
'
Pacific Southwest ReQQRRECTT” ‘OPT
CLASSIFICATION
HOLMES &€ NARVER, INC.
ENGINEERS * CONSTRUCTORS
828 So. Figueroa Sit.
LOS ANGELES t7, CALIFORNIA
UNCLASSIFIED
U. S.A. E. C, CONTRACT AT-(29-2}-20
OUTGOING — WHITE
INCOMING — GREEN
ASST GEN MOR
OPERATIONS
_
0903hhZ
Priority
Routine
Deferred
HOLMES AND NARVER ENIWETOK
TO:
|
AVG ROT
DATETIME-GROUP:
FROM:
DAT
FEB
|
XXX
XXX
Q_
HOLMES AND NARVER LOSA
ENGINEER MESSAGE 010).
ENGINEERING
HOWELL TO CORAY.
INFO DAVID L NARVER JR.
WORK BE DONE ON BUILDING 347
EE
|
CONSTRUCTION*OPER
~
At
RECOMMEND THAT NO
INFILTRATION LINES UNTIL APPROVAL
TS RECEIVED FOR COMPLETE INSTALLATION.
REQUEST THAT FRE 6472 BE
PROCESSED TO PROVIDE BACK UP FOR EXISTING INTAKE.
MOSS SCREENS
CONSTRUCTED PER FIELD SKETCH 79) ARE SATISFACTORY UNTIL POSITIVE
PURCHASING
:
MEANS OF MOSS ELIMINATTON ARE APPROVED
09/0042 FEB 1953
SRCEDWINGE EST
PERSONNEL
BEST COPY AVAILABLE
FISCAL
“~~;
CONFIRMATION COPY RECEIVED BY MAIL 19 FEB 1953. CORRECTION UNDERLINED
NATIONAL
ARCHIVES
REPOSITORY aGA1C seu TH WEST RECION
SECURITY
COLLECTION S& 3e6 ATOMiC EmeRey ComMiss:ons
BOX No, [27624 C608) Alg 334 326-65 yorr3
ADMINISTRATION
EP: CK BY
CEMER GENERAL
FOLDER 228 834 PROTECT ENGINEERING FILE
DAVID LL. NARVER JR Z
CERTIFYING OFFICIAL:
CORRECTED COPY
fh
A ANTIet
i
PREPARA fA TEONAI
1O¢
: