Operations Plan - Mission No. 10 FY 1979
Page 3

3.

Insure one medical trailer installed on starboard side of
ship and whole body counting components are aboard by

August 17.

4.
5.

Identify and make available a vehicle (4 x 5 pickup or van)

for BNL use.

6.

MAC arrangements back to Hono.

7.

Arrange to have portable generator, 16MM. movie projector

8,

Linens, etc. for scientific bunk quarters.

9.
Vil.

Insure all BNL and vessel cargo is identified and put aboard
vessel. Same with gift food per phonecon with PASO.

and electrical cables on board.

Insure 2 whalers, 2 drums pre-mixed outboard gas and 2

drums diesel aboard.

FUNDING
Program charges for this mission are to be recorded against
BNL (Nat Greenhouse) purchase order with Holmes & Narver.

IX.

REPORTS

The Party Chief and the DOE/PASO Representative will prepare and

circulate mission reports within 30 days after completion of

the operation.

Specifically, as agreed at the Livermore scheduling

meeting of July 24th, the reports should be circulated to all DOE
and contractors involved,
In this case reports should go to
Drs. Wachholz, Weyzen and Pratt, Roger and Bill Stanley.