Table 0-54.
Americium-24] radionuclide concentration summary of individual
soil profiles taken on Enidrik Island (B-17) in pCi/g dry weight.
Location
Date?
0-5 cm
5-10 cm
10-15 cm
15-25 cm
25-40 cm
40-60 cm
Site
99
7811
1.358€+01
4.937E-01
}.642E-01
8.383E-01
2.541E-02
4.361E-02
Site
Site
Site
Site
140
141
142
143
7811
7811
781)
781)
2.503E+00
4.522E-01
3.312E-01
2.567E~01
2.246E+00
5.626E-02
4.260E-01
2.116E-0]}
2.965E+00
2.438E-02
3.583E-01
1.680E-01
4.371E-01
4.377E-02
2.104E-01
3.806E-02
3.703E-01
7.568E-02
1.315€-01
3.604E-02
2.816E-01
6.257E-02
9.029E-02
6.833E-02
Site
Site
Site
Site
144
145
146
147
7811
7811
7811
7811
3.393E-01
2.482E-01
1.375E+00
2.809E+00
1.487E-01
1.288E-01
1.528E+00
3.294E+00
9.261E-02
2.497E-01
1.686E+00
4.230E-01
1.034E-02
2.704E-01
5.099E-02
2.152E-01
1.028E-02
2.533E-61
2.061E-01
8.482E-02
1.568E-02
2.491E-01
NDAD
1.351E-02
Site 148
7811
2.189E-01
2.154E-01
2.146E-01
2.170E-01
2.423E-01
2.214E-01
Site 149
7811
1.B68E-01
1.391E-01
2.195E-01
2.372E-01
2.852E~01
3.127E-01
Site 150
7811
1.060E-01
2.152E-01
2.579E-01
4.842E-01
6.275E-01
1.994E-01
Site 151
Site 152
Site 153
7811
7811
7811
2.165E-01
1.891E&+00
2.777E+00
1.641E-01
1.172E4+00
2.357E-01
3.446E-02
7. 459E-01
8.806E-02
1.723E-02
2.622E-01
2.119E-01
4.054E-03
3.378E-03
2.364E-01
1.0714E-03
2.365E-03
1.697E-01
Site 154
Site 155
7811
7811
1.991E+00
3.660E-01
5.748E-01
2.533E-01
7. 140E-02
7.095E-01
3.027E-02
5.338E-01
3.820E-02
4.955E-01
3.580E-02
NSTC
Site 156
7841
2.373E-01
2.899£-01
3.653E-01
3.248E-01
4.189E-01
¥.466E-01
Site 157
Site 158
Site 159
781)
7811
7811
8.410E-02
5. 324E-01
4.797E-01
6.797E-02
4.671E-02
8.311E-01
4.680E-02
8.297E-02
5.968E-01
8.086E-02
4.499E-02
2.645E-01
4.676E-02
2. 783E-02
5 .018E-02
2.886E-02
4.082E-02
NST
Site
Site
Site
Site
Site
Site
160
161
162
163
164
165
7811
7811
781)
781)
7811
7811
5.077E-01
4.914E-01
3.829E+00
3.630E-01
4.024E-01
2.386£-01
5.545E-01
8. 167E-02
8.860E-01
2.636E-01
4.171E-01
2.774E-01
6.608E-01
5. 351E-02
9.721E-02
9.761E-02
4.521E-01
2.910E-01
1.104E400
2.821E-02
9.468E-02
7.626€-02
4.440E-01
1.136E-02
1.470€-01
2.134E-02
2..866E-02
5.617E-02
6.964E-01
4.362E-03
9.572E-02
2.590E-02
1.957E-03
4.595E-02
9.339E-01
NST
Site
Site
Site
Site
166
167
168
169
7811
7811
7811
7811
6.311£-01
1.767E-01
6.144£-02
3.914E-01
5.640E-02
7.B842E-02
2.910E-~02
1.235E-01
5 .532E-02
1.664E-02
5.766E-03
4.973E-02
5.297E-02
1.891E-02
1.169E-02
4.977E-02
1.266E-01
1.539E-02
2.049E-03
4,.119E-02
5. 968E-02
2.123E-02
1.370E-03
4.239E-02
Site 170
7811
8.223E-01
6.492E-01
8.478E-01
2.174E+00
3.243E-01
1.661E-01
NOTE:
Specific activities are not decay corrected to 1987 but based
Sampling sites are shown in Fig. A-12.
on
the date
taken.
4 The date is given by the last two digits of the year followed by the month, e.g., 7811 is
November 1978.
b Sample was taken but no data is available.
C No sample taken.
9000538
0-62.