ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 43 @

(3. 90)

AS-BUILT DRAWING NUMBERS AND DATES:

A-L
Bla
E3
Ml
M2

sHeeT wo.20 or 20

COMPLETION REPORT FOR

b/2/51
4/2/51
4/2/51
A/2/51
2/51

M-3

M5
6~1
8~2

“Property

S-3
8-4

CONTRACT NO,

JOB NO. 640 = lh
For:

Number

LOCATION RUWIT ISLAND - SITE "Cc

The Complete Construction of

8-100
30-608

"Not for use by a_fese ou
DATE OF THIS REPORT:
‘

2 april 1951

300! STEEL TOW

Bullding No, :
ESTIMATE

0-623
Quantity

DESCRIPTION OF PROPERTY UNITS

Account

_AT~(29—1)-507

Unit

Construction
Cont ract
Cost

Est'd. Value

Gov. Furnished
Material

Engl neering
Cost

Total

200! STEEL TORER

A steel tower, 27’ heel to heel at foundation, l0' section at 12'-6" elevation,

{

ring to 20'.0* leg spacing, triangular section, with ladders and crossover
platforms every 25', rising to 301'-6* elevation, erected on reinforced concrete
feantation and base slab with piers and footings spaced 27'-0" under the three
lege and ecnnected with tie beams, lift pit included and 3" asphalt concrete

peving to = 100! redius, and 1 1/2° asphalt paving to s 1000' radius, at the

t

301'~6" level
steel fremework sise 16' x 22'-O" provides mchorage for the
frame tower house, sise 16'=y" x 16'-0" x 13'-O" high, corrugated aluminum
f ond aide, plastic glasing, grating floor with 7' x 7' opening,
hatehes
roof for hoist block and scoess, roof is provided with a catwalk,
the tower structure continues to a height of 322'-4" where the main hoist beas ie
wapported by °A° frame construction, on top of the structure are lightning rods
grounding cable, end aircraft warning lights; at the 250' level three

permanent guys (1 1/2° diemeter) areatteched and extemi 353' to conerste

enchorage below, (3) cubic yards concrete each); two messenger cables, 636'

each, are provided emi anchored in concrete blooks,
3' x h' x 6' for supporting
the ecaxial cable and a hend wineh and cable (650') for their installation,

the elevator end main hoist meshines (2) are mounted om concreted foundations
and a motor gmeretor is housed in a wood frame, corrugated alumimm covered
roef, aise 12'-0* x 12'-0" z 9'-3" mean height, on a conorete slab,
With adjacent trensformar bank on a 6" concrete slab, sise 3}' x 7', the
garroumding eres 17' x 13' is enclosed by a wire fence, the tower house,
structure, and ares is complete with electric wiring end fixtures, elevator cab,

main hoist, telephone installation, aad 100 fest of security fencing.

TOTAL - Tower Coste

$213,458.28
95,321 045

TOTAL - Asphalt Paving Cost

SRE

$65,976.17

299070293

ofa

$1,303.27

$210,083.00

$829.02

$95,876.12

the National
ranemianion

*Proration of
Charges to Unita