AS-BUILT ORAWING NUMBERS AND DATES:
Fs=4)

7

ATOMIC ENERGY COMMISSION

OFFICE
SANTA COMPLETION
FE OPEPERATIONS
REPORT FOR

JOB NO. 640 = kr

W6/si

;

CONTRACT NO,
For:

AT=( 29—11-507

Account
Number

,

"Not for use by A-E

LOCATION RUNIT ISLAMD - SITE "Cc"

DATE OF were
6 April 19

The Comptate Construction of Cargo Pier and Personnel Landing

Bullding No.:
"Property

sucer no_2h of 20Page 20.3

queerllt:

DESCRIPTION OF PROPERTY UNITS

126

Quantity}

Pr

ESTIMATE

unit

Construction

Contract
Cost

Est'd. Value

Gov. Furnisned|
Matertal

Eng!neering

Total

$234.64

$133,445.01

CARGO PIER AND PERSOMNEL LANDING

A wood structure consisting of piling, and timber with 3" decking, sise 18'-0"
Wide x 176'-2" long, with wing walls to roadway and personne) gangway landing
at one side. Total area of deck 3,267 square feet.

1

Each

Direct

Indirect}

$78,613.80
5h,996.57

Mis docum-

foe National

sf

Pariser: j. 7,

besnitutest+

*

Charnestounite