od

wae

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFo.43e
13-80)

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:
2b-108

JOB NO,

640 = ld

we

For:

25-123 22/

28-402 12/ 7/50

CONTRACT NO. _AT=(29-1)-507__

eee

LOCATION PARRY ISLAND - SITE *B*

The Complete Construction of 36 Man Quarters

Buliding No.:

a2 ye 12
“Not for usalby Agt Opclutive
DATE OF THIS REPORT: and Page 16
8 December
199

100 to 110 Inclusive and 206

‘Minor variations in the construction of different buildings

"Property
Account

SHEET WO. 2 or_68

ESTIMATE

DESCRIPTION OF PROPERTY UNITS

Quantity

i
Unit

Construction
Cc ont ract

Est'd. Value
.&F
Boyeere
ahed

Engineering
Cost

Total

26 MAN QUARTERS
This is a ane story, double roofed, prefabricated aluaimm building erected on a
concrete slab, complete with electrical wiring and fixtures, fresh and salt
water plumbing, telephone installation, end alumious partitions providing nine (9)
roams, toilet and showers, corridor md vestibule. The sise inside is 2),'-0" wide
x 128'=8 1/2" long x 10'-O" mean height. The total floor area of this building
ie 3,268 equare feet and the cubic content is 30,890 cubic feet.
This
contains the following equipment and furniture: One 10 gallon
water cooler with drinking fountain; one wall type telephone; two fire

extinguishers; six mirrors; 36 alumimm lockers; and 36 beds,

12
i

Zach
Each
Direct

Indirect}

TOTAL COST

12

Unite

$27,936.00

10,100.28

$530.70

$35,566.98
$462,803.76

"Prorat
'
ation
Charges
to o Unita