=
SFO. 43 0

(3. 90)

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SHEET wo._

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:

20-906.2

20-302.)

20-949.

JOB NO.

1/19/51

O40 = le

CONTRACT NO.

For:

1/19/51

1/19/51

5

or_2

��Not for use by A-E

AT-( 29-1) ~507

LOCATION

Page 5

DATE OF THIS REPORT:
19 January 1951

RUNIT ISLAND — SITE *c*

The Complete Construction of Open Air Motion Picture Theatre

Bullding Ne.: 103
ESTIMATE

“Property
Account

DESCRIPTION OF PROPERTY UNITS

Quantity

unit

1

Each
Direct

Construction
Contract

Est'd. Value

Gov.Furn! shed

Engineering
Cost

Total

OPM! Aig MOTION PICTURE THEATRE
Seating capacity - 202 seats, 14 wood benches with back rests. Screen structure
sise 21'-O" wide x 17'-0" high; transite screen 16'-0" x 12'-0", anchored to
reinforeed concrete piers and footings; wood stairway and platform at one side
of screens; canopy. Screen S?'-6" fron projection booth. Electrical and speaker
servies.

Projection Booth - ome story wood and aluminum construction; rectangular

shape; sise 6'-0" x 11'-6" x 8-0" highs set on a kh" concrete slab; 2" x L*

With corrugsted aluminum roofing and siding; electrical services; floor

area 0.D. 92 square feet; oubic content I.D. 616 cubic feet.
Installed equipment includes: Two scund projectors.

Flood lighte.

Indirect

06,655.44
3,056.90

>

$116.12

99 , 858 46

*Prorat| on

?

Charges to oa Unite

Select target paragraph3