aaaonTe COMMISSION SANTA FE OPERATIONS OFFICE SFQo-41¢4 (3. 90) a.” COMPLETION REPORT FOR AS-BUILT DRAWING NUMBERS AND DATES: 28-5115 28-321 408 NO. 610 = 1f 2/21/51 CONTRACT NO. For: 2/2h/S1 LOCATION AT-—( 29~1 }-507 The Complete Construction of Bultding No.: oneeT mo.2 or 68 \ “Not for use by A-£ PARRY ISLAND - SITR "5" Pagel \ DATE OF THIS REPORT: 2, February 1951 Man Tents 1 - SO Inclusive ESTIMATE "property Account DESCRIPTION OF PROPERTY UNITS Number Quantity unit sO Each Gonat ruct lon Est'd. Value Eng! neering Contract Goveturn lehed Cost *Proration of T otal 4 MAN TENTS & four wan tent, fly and wood frame anchor bolted to a |," concrete elab, sise 1y'-2" x Lyt-~&", alab exyen 208 square feet, complete with electric wiring and fixtares. i Each Direct Indirect TOTAL COST So Unites $327.22 232 268 4 3| $560. 73 $26,036.72 Charges to Unite