ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 430
(3. 30)

AS-ButLT DRAWING NUMBERS AND DATES:
2B-5685 3/19/51
28-5321

SHEET NO. S) or_68

Pages 162 & 163

COMPLETION REPORT FOR

2b-516
28-5328

JOB NO.

640 - lw

3/19/52

Feropecty|
Property

Account
Number
pot

CONTRACT NO, AT-(29-11-507_
For:

3/19/51
3/19/51

"Not for use by A-E

LOCATION PARRY ISLAND - SITE '*B"

,

The Complete Construction of Underground Shelter & Guard Towers

DATE OF THIS REP@RT:
19 March 1951

©

*

334, 335, and 33%

Building No.;

ESTIMATE

DESCRIPTION OF PROPERTY UNITS

Quantity

unit

Construction
Cont ract
Cost

Est'a. Value|
Gov, Furnished
Material

Engineering
Cost

Total

UNDEHGROUND SHELTER - Building#334
Reinforced concrete vault construction with 10" thick roof and walls and 12" thick
deck set entirely below grade.
Inside dimensions 10'-0" x 10'-0" x 7'~+) 1/8" high
furnishing 100 square feet floor area and 712.5 cubic feet content. Enclosed
accesa ramp has 5" thick concrete deck, 2" x 10" frame covered inside with 1/2"
plywood, and outside with 2" x 6" T & G diagonal sheathing covered with 2 ply

15# felt mopped on. Equipped with electrical fixtures and underground connections
to Buildings #335 and #336, all inside 100'-O" x 4'-O" chain link fance and

barved wire enclosure.

GUARD TOWERS - Buildings #335 and #336
Wood frame, shed roof construction with 90# mineral surface composition roofing
and plate glass windows on four sides. Interior dimensions 6'-O" x 6'-0" x 7'-6".
Metal greting deck 6'-O" above grade and accessible by wood ladder extends three
feet beyond structure forming a balustraded balcony on all four sides. Structure
is supported by four 6" x 6" posts, cross-braced and anchored to reinforced
concrete piers. Electrical facilities are provided.

1

Area
Direct
Indirect

$16,617.42
13,17742

$102.51

$29,897.34

*Proration of
Charges to Units

Select target paragraph3