ATOMIC ERERGY COMMISSION
SANTA FE OPERATIONS OFFICE

»

JOB NO.

-BUILT ORAWING NUMBERS

2B-146

12/23/50

23-150

12/23/50

28-324

12/23/50

2B-428-1

§=640 - ld

¢

CONTRACT NO.

or :

OF

68

Page 112

DATE OF THIS REPR@RT:

23 December 1950

3}
Motor
and DUKW Repair Shop

.

322

ESTIMATE

Property
—-

48

"Not for use by A-E

LOCATION PARRY ISLAND - SITE "Bp"

oT he Complete C Construction of f

Bullding No.:

12/23/50

recount

_AT-129-1)-507

;

SHEET NO.

Siani+

COMPLETION REPORT FOR

1
Quantity

DESCRIPTION OF PROPERTY UNITS

i
Unit

Construction

Cc ont ract

Est'd. Value

. Furniished
Goween

Engineering

*Proration

Cost

fo ee

Total
_————

MOTOR AND DUKW REPAIR SHOP

One story aluminum constructions rectangular shape; size I.D. 24'~O" x 60'-8 1/2"
x 12'-0"; set on 5" thick concrete slab; double roof, separated by 2" x 4" red-

woods vented window panels; aluminum partitiona; benches; sliding doors; with
lighting and power services; telephone installation; plumbing; floor area 0.D.

1,557 square feet; cubic content I.D. 14,570 cubic feet.

Two concrete slabs, 5"

thick, 15'-0" x 17'-O" and 21'-O" x 32'~O", total 927 square feet.

Installed equipment includes: Two floor jacks, two tool sets, one compressor,
amd one water cooler with drinking fountain.

.

1

Each

Direct

Indirect

$11,816.88

4,097.28

$254.8),

$16,169.00

of

|
Charges on to of units

Select target paragraph3