AS-BUILT DRAWING NUMBERS AND DATES:

2B-918

9=12/27/50

2-923.

12/27/50

28-476

12/27/50

2B-652

12/27/50

28-929

28-938

12/27/50

§=12/27/50

28-5134 12/27/50
"Property

2B—381

JOB NO.

640 -1

12/27/50

FS~291-1 «12/27/50

CONTRACT NO. 29-15-507_
For:

The Complete Construction of

Buliding No.: 221

FS-291-2 12/27/50

DESCRIPTION OF PROPERTY UNITS

.

Page 7h

27 December 1950

ESTIMATE

Quantity

Unit

Construction
Cont ract

Est'd. Value

Govepuro shed

Engineering
Cost

Total

TASK FORCE HEADQUARTERS BUILDING

Cae story alusinum construction; "E" shaped; sise I.D. 2)'-0" x 152'-6 1/2" x
12'~0" high, with three 2'-O" x 106'-8 1/2" x 12*-0" high wings; set on 5" thick

concrete slab; double roof, separated by 2" x " redwood; vented window panels;
sluminum partitions; cabinets, shelving, sap boards, tables; weather proofing and
insulation; two concrete walks '-0" x 35'-O"; communication facilities consisting
of two elevated catwalds, 5'-3" x 8'-0", each mounted on two poles extending 10

feet above ground with « messenger cable running between Worth and South catwalks;
two 10 EVA electric plants mounted on a reinforced concrete alab 10'-0" x 10'=0",

located 55 feet west of north-west corner of building; two runs of 2" conduit,

underground, extending from slab to teletype roam of building; with electrical

wervices; pluabing; floor area 0.D. 11,930 square feet; cubic content I.D.

113,482 cubic feet.

Installed equipment and furniture includes: Four water coolers with drinking
fountains, ome door vault, and two exhsuster fas.

or_68

DATE OF THIS REPORT:

Task Force Headquartera Building

“

26

"Not for use by A-E

LOCATION PARRY ISLAND - SITE "8B"

FS-293-3 12/27/50

Account

SHEET NO.

Meee

COMPLETION REPORT FOR

1

Each

Direct
Indirect

$1,327.76
46, 619.

*,

$1,671.16

$139,818.35

*Proration
Charges to ofUnits