ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO.43 a

13.50)

AS-HUILT

ORAWING NUMBERS

3H-253.3

JOB NO.

AND DATES:

3H-250.4 2/2h/51
3-251 2/24/51
HH-25204 2/24/00

For:

AT-1 29-13-5607|

Location

No.:

DESCRIPTION OF

-

.

ee

Quantity

_

lol _ OF

DATE

OF

THIS REPORT:

2h February 1951

Station Mo. 823

ee

PROPERTY UNITS

NO |

"Not for use ty A-E

EWIWETOK ATOLL

pa

ete

SHEET

The Complete Construction of Wing Models
Building

2/24/51

"Property
7

(ONTRACT NO.

G2 = 10

30-088 2/24/51
170-817 2/24/51

BH-254.4 2/2h/51

oe

Account
Number

ee

COMPLETION REPORT FOR

Unit

_—___|—_

Construction
Contract
Cast

tS TT

1 MATE
.

y kstta, Value
Gov, Furnished
Material

‘

:
ng i nee ri ag
Lost

"Proration of
Charges

po

AMC HSQUIRED CONSTRUCTICN AND LOCATION OF THE FOLLOWING STATION:
WIM0 MODELS,

STATION

£623,

SITE "Q*

Aocurately located reinforced concrete foundations as follows:
4 and B. one each 1h'=-0° wide x 12'-0" x 2'-0" thick with two 14'-0" long steel
a
Ported horisontally to each.
Concrete Total « 25 cu. yds.
By and By ons each 10'-O" x 16'-0" x k'-0" thick with two 16'-08
bolted bérisontally to each.
Concrete Total - 47.4

steal columns
cu. yds.

By one 2'-O" x 1,'-0* x 2'-0* thick with threaded J bolts pro
two deadman, concrete, with 3/l" diameter protruding J bolts, sise each }'-8" x 3'-8" x
3'=0", one on each side and steel junction box with underground conduit.
Concrete Total - 10.3 cu. yde.
Bj, one 6'=0" x 9's" x 2'-O" thick with two 9'~O" long steel columns bolted
horisontally and steel junotion box with underground conduit.
Concrete Total - 4 cu. yds.

1

Each

Direct

Indirect

$16626.62
12,102.15

o,f

$251,.80

‘9

$26,983.57

to unite