ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 430
(3. 501

eRy

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATE:

JOB NO.

3E-5696
4/2/51
5695.1 4/2/51

729 - 26

CONTRACT NO.
For:

LOCATION

AT—(29-11-507 |

The Complete Construction of

SHEET no. 98 of_ ee

"Not

ENIWETOK ATOLL

2 April 2951

Gengx Collimator Towers f1, #2

Stations 145 and 146

Buiiding No.:

ESTIMATE
-

ne ee

“Property

we ee

ee ee

Be a

-—

a

Loastric tion ]

Account
wee ee

0

ve SCREPTION OF

ee

oe

ee

PROPERTY UNITS

for use by A-E

DATE OF THIS REPORT:

Quantity

oe

Unit
—

mont rant
eh

Est'd.

—

Value

_

=

_

_——_——-— $—

engineering

OM tapes

Cost

a

Total
--

GANEX COLLIMATOR TOWER #1, STATION 145 OR SITE "D - ¥"

|
'

A steel tower sise 10'-0* x 10'-0" x 29'-8 5/8" high with timber deck, steel ladder,
GQhain hojet and trolley, sreated on a reinforced concrete foundation and footings

|

4t=0° mindaum below grade,

1

Each
Direct

Indirect

|

GANEX COLLIMATOR TOWER #2, STATION 146 ON SITE "D - ¥"

|
|

& steel tower, size 10'-0" x 10'-O8 x 19'-9 3/16" high, with timber deck, steel
ladder, chain hoist and trolley, erected on a reinforced concrete foundation and

| footings 41-0" sinimum below grade,

1

2,009,24

$251.51

$6,956,008

4,033.07
1,861, 51

213,66

6,108, 24

394,20

13,859, 66

2TT 29

9,478.18

Each
Direct
Indirect

|

$4,695 33

GANEX COLLIMATOR TOWER #1, STATION 145 Ol SITE "E*

|

A steel tower, 10'-O" x 10'-0" x 38'-2 3/4" high, with timber deck, ladder,
chain hoist and trolley, erected on a reinforced concrete foundation and

footings 4' mintsum below grede,

1

Each
Direct
Indirect

7,995 G4
5 469,82

GANEX COLLIMATOR TOWER #2,STATIQH 146 OW SITE "E*
A steel tower, 101-0" x 10'-0" 223'-) 3/6" high, with timber deck, ladder,
chain hoist and trolley, erected on « reinforced concrete foundation and
footings 4' siniaus below grade,
~

‘ ee in

r

yon ree!

Ny grad
pecattne wader

1

Each
Direst

5, 566,31

Indirect

3,634.58

Charges to Units

_--_--f _. —_-___.--

UCRL AND NRLK KEQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
|

—~

"Proration of

——_—

Select target paragraph3