ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 434

(3. $0)

SHEET wo. 22 or _68
Pages 65, 66, 67

COMPLETIOW REPORT FOR
JOB NG. 640 - ld & e

AS-BUILT DRAWING NUMBERS AND DATES:

:

an

vag

28-433

1/19/51

CONTRACT NO.

For:

"Not for use by A-E

AT-( 29-1 }-507

LOCATION PAARY ISLAND ~ SITE "pb"

The Complete Construction of

Building No.:

DATE OF

THiS REPORT:

19 Jamary 1951

Counting and Sampling Laboratory

212A, 2176, 2120
ESTIMATE

.

Propert
heceunt.
Number

DESCRIPTION OF PROPERTY UNITS

Quantity

,
unit

-

Construction
Contract
.

Est'td. Value
;
GON e eee ished

Engi
i
ngineering

Total

_

COUNTING AND SAMPLING LABORATURY - Bldg. 212-4

Une story aluminum construction; rectangular shape; size I.D. 16'-8 1/2" x
2k*~O" x 12'-O" high; set on 5" thick concrete slab; double roof, separated by
2" x 4" redwood; with electrical services; plumbing; floor area J.D. 450 square
feet; cubic content I.D. 4,010 cubic feet.

Finisned for humidity control.

1

Each

i

Each

i

Each

COUNTING AND SAMPLING LABOHATORY - Bldg. 212-3
One story aluminum construction; rectangular shape; size I.D. 24'-0" x 2h'=-6 1/2"
x 12'-O" high; set on 5" thick concrete slab; double roof, separated by 2" x 4"
redwood; vented window panele; with electrical services; floor area 0.D. 652
square feet; cubic content 1.D. 6,930 cubic feet. Installed equipment includes:

One roof hood exhauster.

COUNTING AND SAMPLING LABOHATURY - Bldg. 212-0
Une story wood and felt construction (arth Covered); rectangular shape with

tunnel entrance; set on 8" thick reinforced concrete slab and 6" x 1'-6" concrete
walls; size 1.D. 6'-O* x 6'-O" x 7'-O", with 12'-4" x 4'-6" tunnel entrance;

flat roof separated by 2" x 8" and 2" x 4"; exhaust duct; no windows or partitions
with electrical services; plumbing; floor area 0.D. 54 square feet; cubic content
1.D. 252 cubic feat.
(Tunnel not included in area and cubic content.)
Installed equipment includes one roof exhauster.

TOTAL Bldg. 212-A

Direct
Indirect

TOTAL Bldg. 212-3 .

Direct

$8,998.83

TOTAL Bldg. 212-¢

Direct

$1,450.46

Indirect

$10,952.75
h, 256.71

592.60
ee .

$133.61

$15,343.97

$25.70

$2,068.78

The doctor:
the National f

T

"PpCharges
ti to Unite
f
7}

TANS-

nan
enaitasr

Select target paragraph3