ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 434
(3- $0)

AS-BUILT

BY U

JOB NO.

DRAWING NUMBERS AND DATES:

F729 = 19

CONTRACT NO.
burs

sweet No.

5

COMPLETION REPORT FOR

"Not

LOCATION EMIWEPOK aTOLL

AT~( 29—11)-507

Of

DATE OF THI SgPEPORT:

ESTIMATE
--

Account
Number

fp

DESCRIPTION OF PROPERTY UNITS

Quantity

Unit

| Const fuction
Contract
Cost

pe

—

Es t'd. Value
Gov. Furnished
Material

+--+

Engineering
Total
Cost
4

+-—— -

_

*Proration of
Charges to Units

BALL. REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATICNS:
RACK IN TOWER CAB, STATICN NO, 1 GH SITE “D*"

To tower,

1

Each
Direct

Indirect

$9,771,953

8,653,19

$201.16

$18,626, 22

396,83
529,20

1,02

935,05

RACK IN TOWER CAB, STATION BO, 3 OM SITE "ER"
In tower

1

Rach
Direct
Indirect

STATON9ONSITE“BP
Building 310, existing Control] Tover

1

_

Rack in Tower Cab

The Comptete Construction of

Huilding No.: Station Mo, 1 and Station No, 9

"Property

oF__

for use by A-E

Each
Direct

Indirect

16,75

22,36

39,40

affecting
ton tte
of ite od biente

ates -

trined pq ren we
pm. fe riminal

penalties inde

Pe term fg

s

Select target paragraph3