_ ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

Seu.a4angq

(3. 50)

Cr LHe AI NG, NUIMiit hs . AND) Gate

erty

{

Acusrant

f

Nwnber

CONTRACT NO, —AT-( 29-1 1-507 |

JOH NO. F2Q =

178-5209-1 - 3/9/51
3E-5637.5 - 2p
38-5686.1 - 7/9/51
“br

SSS.

COMPLETION REPORT FOR

For:

The Complete (onstruction of

LOCATION

EMIWETO£ ATOLL

58

*Not

for use by A-E

OATt

OF THIS REPORT:

9 Mareh 1951

Panels, Camera House & Battery Box

fonstroe

OB SCRIPTION OF
+

PROPLRIEY UNITS

pee ee.

|

| wRDC- 1a. - REQUIRED CONSTRUCTION AMD LOCATION OF THE FOLLOWING STATIONS:

|

|

Quantity
————

Unit

—o to ee.

PAWKELS, STATIONS 62h, 60he, LOCATION "8"

2

each

1

each

tis

Contras t
Gat
a

]

tis TIMATE
tst'd, Value
OOy,
harnisghed
Material

_—+—

a

Fagineeriag
Cost

qT

ota

i

CAMERA HOUSB AND BATTERY BOL, STATION Gelb, LOCATION “8*
A reinforced concrete structure, aise 0.D. 2°-0" x '-0" x 8-0" high with 11.0"

|

OF

Building No.: Stations 624, ela, Gelb

|

|

SHEET NO.

below grade, topped with metal hood 2'-0 3/1" high, reinforced goncrete battery
box with metal cover eat grade level and, wood frame shelter sise I1.D, 3'-8" x

4-1" x 5'-6" high, oanvag cover, sise 7'-0" x 6'-0",

TOTAL: Station 42h, Gee, dalb

Direot
Ind ir eot

$4,964.31
5,933.99

$50.54

$10,065 ..8L,

*Proration
of
.

Charges to Unite

Select target paragraph3