ATOMIC ENERGY COMMISSION
‘SANTA FE OPERATIONS OFFICE
510-434
(3.50)
SHEET no 44 oF _
COMPLETION REPORT FOR
Ate pT Le AW IN NUMER
3G-028~-3
-4,/2/51
3G-082-2.
4/2/51
3G~082-]
AND
ATE
JOH NO.
F2G = 15
CONTRACT NO, AT-1 29-11-07
"
2/21 51
for:
Ine Complete Construction
boas count
|
Number
|
{
'
"Not
for use
DATEL
QF
Tente
||
“£5: RIRTION OF PROPERTY UNITS
.
--
eeee ee
ee ee LE MATE
on
oe
:
Quantity
ee
poe eee
Unt
—.
Constrac tion
Contra t
a
-
fest
~ ee
ee
tst'd.
Value
aov. Furnished
Materia!
Oe
oe eee
wo
— eb
bnai
ngineen "9
tos
—+-- --——- -
An eight man tent and wood frame bolted to a 4" concrete slab, sise 15°-10" x
31'=10", alab area 504 square feet, complete with electric wiring and fixtures,
1
—
Rach
Direct
Indirect
$789 36
259, 69
$43.19
$1,092.24
1,551, 37
1,124.34
76,46
2,752,17
957,38
357,00
52,37
1,366.75
1,380.51
647,16
73,48
2,102,15
TENT STATION NO, 22a aND b, SITE *C*
4n eight man tent and wood frame anchor bolted to a 4" concrete slab, sise 15'-10*
X 31'-10", elab area 504 square feet, complete with electric wiring and fixtures,
2
Each
Direct
Indirect
{
TENT STATION NO, 22a AWD b, SITE "E®
An eight man tent with wood frame set on a 4" concrete slab, sise 15'-10" x 3]'-10",
lab area 504 aquare feet, complete with electric wiring and fixtures,
2
Kach
Direct
Indirect
{ENT STATION RO, 24a AND b, SITE "B*
|
Tent on a 4" concrete slab, size 16' x 32' with electric wiring and fixtures,
2
Each
Direct
Indirect;
"Thin dg
says
Pas ore
.
"Pre
Totai
-s—-
TENT STATION NO, 22, SITE "D = ¥*
|
A-§
2 April 1951
| WORL REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
|
by
THIS REPORT;
tuilding No,: Tents 22, 22a and 22b, 240 and b
ee
“bropert,
of
(OCATION ENIWEPOK ATOLL
the Nat
tranamed
ip any
prohibits
penailie
_
ee
/
ChargestoG rm
--
-
~~
ges
TO
Units
eee ee
He