;
sFo.a30

ATOMIC

,

13.50)

SANTA

ENERGY

FE

COMMISSION

OPERATIONS

OFFICE
SHEET

COMPLETION REPORT FOR

AS-BUIL T GRAWING NUMUPRS ANI DATES:

JU NO.

F29"29

3E-6619 - - 3/9/51

CUNTHACT NO. AT-( 29 L)-b07_
Fur:

3B-5678.3 - 3/9/51

lie oomplete Construction of

3E-5679.2 - 3/9/51

i

Vurlding No.:

3E-5681.5 - 3/9/51
3E-5155 "Property

Account
Number
F cones

3/9/51

a

i

"2

Se

aU

wee

CONSTRUCTIO
A

Wuantity

ON

S_NO

ough

0

OLLOWING

wee

up to the casting and continues as a cored alot to the upper section of the
casting
assembly, the two sectiona being keyed and bolted with metal to metal
tightBearing surfaces,

tstid,

Value

.

,

Cantract
aov. Furaished}|
Poutlneeriag
wot
Material
hast
—
ee ep
_

|

Total

.

Proration of
Charges to Units

;
4

Each

SIT.

A machined steel casting assembly, base size 10'-6" long x 2'-O" wide, height
61-6", leveling plate and 32 = 2" dis. anchor bolt assemblies for mounting level
and grouting

but eM ad

ON

wen

framed slot 4" x 2'=-0" runs from the cavity near the bottom of the foundation

NO

fee ee of ee

for use by AcE

STATIO

4 machined steel casting aasembly, base size 10'-6" long x 2'-O" wide, height
64-0", surface studded for inoasing in e 3“ thick split special stucco mask,
leveling plate and 32 - 2" dia. anchor bolt assemblies for mounting level and
grouting to a reinforced concrete founcation, size 0.D, 22'-0" x 9'-O" x Btn"
thick, 60 cu. yds., top level with grade, pit at one end for sealing entrance
to steel formed cavity with concrete blocks ami steel cover plate. A steel

TIGN

Unit

|

9 March 1951

foustr. tice

PROPERTY UNITS

37. OF

pATL ok tHis*REPURT: ,

Bir Bottle

§tations l2la through 12le

ee
bit KIRTEON OF

"Nut

LOCATION ENIWETOK ATOLL

NO

|

to a reinforced concrete foundation, size 0.D. 22'-0" x 9!-O" x

81-2" thick, 60 ou. yde., top level with grade, pit at one end for sealing

entrance to steel formed cavity with concrete blocks and steel cover plate,
ateel framed slot 4" x 2'=0" runs from the cavity near the bottom of the

A

foundation up to the casting and continues as a cored slot to the upper section
of the casting asseably, the two sections being keyed and bolted with metal to
metal tight bearing surfaces,

i

Each

TOTAL, STATIONS NO. 121 a through l2le

Direct

Indirect

#110,688.

52,276.

$638 .28

$163,803.00

thon
ited Ocates Ie
of iw conten

* :

penalties

Render any

severe cnapion)
* Ferree! Laws ‘'

Select target paragraph3